color timing meaning in Chinese
颜色调整
Examples
- According to the trigger rules of colored timed workflow net , simulation strategy is build to describe the action of workflow system
根据着色时间工作流网的触发规则,探讨工作流系统行为的仿真策略。 - Use , installation and maintenance 1 . align the white colored timing scale mark on engine timing gear with the position line of engine timing scale mark
将发动机正时齿轮上正时刻度白色标记线拨至与发动机正时标记位置线对齐。 - Then the methods using reachability graph to analyze static and dynamic structural performance of colored timed workflow net are improved , and the theorem verifying whether there are deadlocks or traps in concurrent workflow are put forward using reachability graph
通过可达图分析着色时间工作流网静态和动态性能,提出用可达图检验工作流中是否存在死锁和陷阱的判断定理。 - Concurrent workflow model based on colored timed petri net is introduced into the workflow management system , and floating - delay is adopted to define colored timed petri net . transformation from workflow model to colored timed workflow net model is realized through workflow engine
将着色时间petri网引入到工作流系统建模中,采用不固定时延定义着色时间petri网,通过工作引擎实现了工作流模型到着色时间工作流网模型的转换。 - Furthermore , intervals between each task are minimum and avoiding tasks overflow are taken as optimal objective of tasks scheduling . in that case tasks scheduling of workflow management system in time level is implemented . mathematic models of multitasks scheduling about basic colored timed workflow net are deduced , and the formulae of calculating the whole workflows running time are presented
以避免工作流产生溢出和各任务间的时间间隔最小为任务调度的最优目标,实现了工作流管理系统在时间层面上的任务调度,导出基本着色时间工作流网多任务调度的数学模型和整体运行时间的计算公式。